Shane Long Leading The Player Of The Year Polls
With the season nearing it's climax and the player of the year awards up for grabs Shane Long is the front runner.
The Ugly Inside poll for player of the year is obviously a lot smaller than the poll conducted by the Daily Echo which since it's inception in the mid 1970's was the the official club player of the year award till Nicola Cortese banned the paper from St Mary's a few years ago.
However both polls are very similar in their voting in that Shane Long is way out in front in what is turning into a two horse race.
In our poll Long has 50% of the vote with Virgil Van Dijk in second place with 36%, the only other player to register anything of note is Steven Davis with 12%. The other 2% is split between 3 players.
On the Echo website the results are similar, Long is enjoying 46% with VVW on 38% Steven Davis has 5%, Sadio Mane and Fraser Forster 3% each, Ryan Bertrand & Jose Fonte 2%, Pelle has 1% with the final player that the Echo nominated, Victor Wanyama, not appearing to have received a single vote.
So unless there is a big swing in the final days then Shane Long looks set to deservedly win the award, it is a pity really that the vote isn't shared as Virgil Van Dijk would be equally deserving and I'm sure that many Saints supporters found it difficult to decide between them
That in itself is an anomaly in that most years there is a stand alone winner polling 75% + of the voting.
The Ugly Inside poll is of course the most prestigious of the polls, the winner will win either a top of the range Bentley, or failing being able to persuade a Bentley dealer to donate one as a prize, a Northam Soul T Shirt.
To vote in the Ugly Inside poll click on the link below.
http://www.fansnetwork.co.uk/football/southampton/members/!/polls/1369/who-shoul
What to read next:
Lewis O’Brien : Just how can the Swans get their man ? The Swansea City board have numerous decisions to make over the coming two weeks, not least the future of Alan Sheehan at the club. The one question that is on a lot of people’s lips though is Lewis O’Brien. We’ve done some work into the player and the parameters that would get him in a Swansea shirt next season.
Another tough test ends in victory for the Swans It wasn’t the best of performances but it was a performance that ensured four wins in a row for Swansea City with no goals conceded. Moving on to fifty seven points in the Championship with three games to play the Swans have an eye on getting over the sixty point line this season. This would be a relatively decent upper mid table finish considering the nonsense under Luke Williams for three months.
Swansea City v Hull City TEAM NEWS & Sheehan latest The Swans take on Hull City this afternoon with nothing really on the line for Swansea and everything for Hull City. The Tigers face relegation as the season comes to an end and the Swans albeit safe from the madding crowd will want a top half finish.
Swansea City extremely unhappy with leaked news on Hellberg link After weeks of speculation an account on Twitter has named Kim Hellberg the Hammarby head coach as of interest to the Swans. Some people will be questioning why after the success current interim, Alan Sheehan has had, saving the club from relegation which was his brief from the start.
Researched : Agents fees increase the Swans debtThe Swans return of agents fees between February 1st 2024 and the same date in 2025 will have caused some eyebrows to be raised. Not least for a club struggling to stay above water as Swansea City are currently.